Skip to main content
Track / Roadmap

A public roadmap that connects development phases to real delivery

The roadmap now sits in the track layer of the resource system, connecting phase planning, release evidence, changelog history, and community feedback.

Public roadmapDelivery phasesMilestonesLaunch tracking
Planned phases
9

public roadmap sequence

Current emphasis
Phase 5

the first measurements with strong hosted models

Primary role
Track

movement and milestones

Connected layers
Research / Changelog / Community

evidence, history, feedback

Connected routes

The pages that make the roadmap more useful

The roadmap becomes more useful when paired with delivery history, release evidence, and community feedback. This card set is also upgraded as the starting pattern for broader resource-card reuse.

Detailed timeline

The detailed timeline and phase view

The existing component is preserved here to keep the phase cards, graphs, and milestone calendar already in place.

Roadmap

Development Roadmap

The phases of the work in the order they are happening, with what is done, what is in progress and what is not promised. Last reviewed 1 Nov 2026.

P1
P2
P3
P4
P5
P6
P7
P8
P9

Public releases (PyPI: delentia-os)

  • 2.4.4 — 2026-11-12 (first-run fixes: adding a device, the picture tool counted against the cap)
  • 2.4.3 — 2026-11-07 (model key kept on this computer, reference-video analyzer)
  • 2.4.2 — 2026-11-02 (the code window opens from the installed program)
  • 2.4.1 — 2026-11-01 (Setup assistant, bilingual stage label, demo reset)
  • 2.4.0 — 2026-10-26 (Desk pages in the package, Windows installer)
  • 2.3.1 — 2026-10-16
  • 2.3.0 — 2026-10-13 (agent runtime, model-free demo)
  • 2.2.x — 2026-06-06
  • 2.0.0 — 2026-05-28

Earlier timelines that showed internal versions 4.x to 8.x and test counts were withdrawn: they could not be verified.

Milestone calendar: what happened, what is next

May 2026 — next
Launch
Feature
Community
Product
Dev Tools
The milestone calendar is reorganized into stronger windows so long Thai and English labels stay readable, time horizons are clearer, and the roadmap reads more like an executive operating plan than a narrow strip calendar.
May
2026
delentia-os 2.0.0 on PyPI (28 May)
1 itemsplanned window
Sep
2026
The agent runtime built; unmeasured claims withdrawn
MCP connector and Delentia Guard on npm
2 itemsplanned window
Oct
2026
2.3.0: the agent runtime on PyPI (13 Oct)
2.4.0: the Desk and a Windows installer (26 Oct)
2 itemsplanned window
Nov
2026
NOW
2.4.1: English demo, hijacked-model demo (1 Nov)
First measurements with strong hosted models
A real Windows Hello test; an install on a second computer
3 itemscurrent window
Next
Public Technical Preview 0.1, declared once earned
Outside testers; a witness the author does not control
Code-signing for the installer
3 itemsplanned window
Later
Design-partner pilots, by invitation
No hosted service, billing or marketplace is planned unless a partner asks
2 itemsplanned window
P1
Completed
Delivery phase

Foundations

The ideas were written down before anything was built.

Phase 1
The FDIA equation, the JITNA packet format and RCT-7 defined
41 algorithm modules written, with tests
Key deliverables2 items
P2
Completed
Delivery phase

The governed runtime

A runtime in which the model proposes and a gate decides.

Phase 2
Agent loop, tool gate, signed approvals and a rule for untrusted text
A hash-chained, signed audit log, a notary and witnesses (built; the witness is not yet independent of the author)
Key deliverables2 items
P3
Completed
Delivery phase

Public release

Something a stranger can install and run on their own machine.

Phase 3
pip install delentia-os (PyPI), a Windows installer and the Desk web pages
A model-free demo that shows the gate stopping a hijacked model; release 2.4.1 (1 Nov 2026)
Key deliverables2 items
P4
Completed
Delivery phase

Honest evidence

What is claimed is what can be checked.

Phase 4
Withdrawn claims listed; the test count on this site comes from public CI
A threat model, known limitations and a comparison with other runtimes published
Key deliverables2 items
P5
In Progress
Delivery phase

First measurements with strong hosted models

No strong hosted model has driven the runtime yet; this phase changes that.

Phase 5
A capability screen of models from many vendors against rules written before the run
Every result goes into a public register, whether good or poor
Key deliverables2 items
P6
Planned
Delivery phase

Public Technical Preview 0.1

The stage is declared only after it has been earned.

Phase 6
A real Windows Hello test and an install on a second computer
A handful of outside testers, with their reports counted
Key deliverables2 items
P7
Planned
Delivery phase

Independent verification

Evidence that does not depend on the author.

Phase 7
A witness for the audit log that the author does not control
Code-signing for the Windows installer; someone else reproducing a measurement
Key deliverables2 items
P8
Planned
Delivery phase

Design-partner pilots

A real workflow, measured against a plain agent.

Phase 8
One workflow per partner, with the pass rule written before the first run
Results published with the partner's permission, failures included
Key deliverables2 items
P9
Planned
Delivery phase

Not planned unless a partner asks

Said plainly so nobody plans around it.

Phase 9
A hosted service, accounts, billing and multi-tenant isolation
A marketplace of adapters
Key deliverables2 items
Velocity Factors

Development Velocity

Development speed may vary month-to-month. These are the primary factors that can accelerate or shift the timeline.

Accelerator
Timeline variable

Community Feedback

Install reports, bug reports and people who try to break the gate are the most useful input there is. There is no paid plan and no funding programme.

Timeline influenceaccelerator
Accelerator
Timeline variable

Team Growth

One author, directing AI coding assistants. More contributors and design partners would speed things up, and would also add review the project lacks today.

Timeline influenceaccelerator
Risk Factor
Timeline variable

Compliance: not claimed

Nothing here is certified for PDPA, GDPR or anything else, and no compliance work is promised. A design partner who needs it would set the scope.

Timeline influencerisk factor
Solo Development Commitment
"Regardless of external support, funding, or feedback — this project will be completed. The target is within 2027, even as a fully solo endeavour."
Initial Goal

Publish the creator's work, build a personal portfolio, and establish SEO presence through this website.

Ultimate Goal

Delentia OS 100% complete. All products launched. A fully operational Constitutional AI ecosystem.

The schedule already accounts for legal, staffing, and external variables — the completion target remains within 2027.

The roadmap should be read alongside changelog and release evidence

Use the roadmap for direction, the changelog for delivery history, and the research archive for the technical evidence behind key phases.